Skip to main content
  • Frequently Asked Questions(FAQ)
  • You are currently using guest access (Log in)
RTB
  • Home
  • Courses
    • L5 MANUFACTURING TECHNOLOGY
      • BASIC OF HYDRAULIC AND PNEUMATIC SYSTEM
      • PARTS PRODUCTION ON CNC MACHINE
      • INDUSTRIAL MACHINE INSTALLATION AND MAINTENANCE
      • pipes and pressure vessels welding.
      • Milling Machine Operations
    • L3 BUILDING CONSTRUCTION
      • PLASTERING OF STRUCTURE ELEMENTS
      • CEMENT FLOORING
      • Erect bricks and blocks wall elevation
      • Erect bricks and blocks wall elevation
      • BUILDING SET OUT
      • OPENING FAXATION
    • L3 Building Construction
      • pipe joining
      • OPENING FIXATION
      • PERFORM PLASTERING OF STRUCTURE ELEMENT
      • PERFORM CEMENT FLOORING CONSTRUCTION
      • CONSTRUCTION BASIC TECHNICAL DRAWING
      • BRICK AND BLOCK MASONRY WALL ELEVATION
    • L4 BUILDING CONSTRUCTION
      • REINFORCEMENTS STEEL BARS WORKS
      • CEMENT BASED BLOCKS AND PAVERS WORKS
      • CONCRETE WORKS
      • QUANTIFY CONSTRUCTION WORKS
      • BUILDING CONSTRUCTION DRAWING
      • Basics of AutoCAD
    • View all
  • Courses
    L5 MANUFACTURING TECHNOLOGY
    • BASIC OF HYDRAULIC AND PNEUMATIC SYSTEM
    • PARTS PRODUCTION ON CNC MACHINE
    • INDUSTRIAL MACHINE INSTALLATION AND MAINTENANCE
    • pipes and pressure vessels welding.
    • Milling Machine Operations
    L3 BUILDING CONSTRUCTION
    • PLASTERING OF STRUCTURE ELEMENTS
    • CEMENT FLOORING
    • Erect bricks and blocks wall elevation
    • Erect bricks and blocks wall elevation
    • BUILDING SET OUT
    • OPENING FAXATION
    L3 Building Construction
    • pipe joining
    • OPENING FIXATION
    • PERFORM PLASTERING OF STRUCTURE ELEMENT
    • PERFORM CEMENT FLOORING CONSTRUCTION
    • CONSTRUCTION BASIC TECHNICAL DRAWING
    • BRICK AND BLOCK MASONRY WALL ELEVATION
    L4 BUILDING CONSTRUCTION
    • REINFORCEMENTS STEEL BARS WORKS
    • CEMENT BASED BLOCKS AND PAVERS WORKS
    • CONCRETE WORKS
    • QUANTIFY CONSTRUCTION WORKS
    • BUILDING CONSTRUCTION DRAWING
    • Basics of AutoCAD
  • L1 CHRONOGRAMS

    1. Home
    2. Courses
    3. CHRONOGRAMS
    4. L1 CHRONOGRAMS

    Topic outline

    • General

      • Announcements Forum
    • L1 CHRONOGRAMS

      • L1 Pig Farming Chronogram 2025-2026 xlsx File
      • L1 Masonry Chronogram 2025-2026 xlsx File
      • L1 Tailoring Chronogram 2025-2026 xlsx File
      • L1 Ruminant Farming and Processing Chronogram 2025-2026 xlsx File
      • L1 Carpentry Chronogram 2025-2026 xlsx File
      • L1 Welding Chronogram 2025-2026 xlsx File
      • L1 Solar Energy Chronogram 2025-2026 xlsx File
      • L1 Domestic Electricity Chronogram 2025-2026 xlsx File
      • L1 Culinary arts Chronogram 2025-2026 xlsx File
      • L1 Hair Dressing Chronogram 2025-2026 xlsx File
      • L1 Auto Repair Chronogram 2025-2026 xlsx (1) File
    • L1 CHRONOGRAMS
    • General
    • L1 CHRONOGRAMS
    • Home
    • Calendar
    About us
    Rwanda TVET Board (RTB) is a government institution established in 2020 by the presidential order No N° 123/01 of 15/10/2020 published in Official Gazette N° 32 bis of 19/10/2020. It was established under the Ministry of Education, to be at the fore-front of all efforts to promote TVET from level one (1) to level (5) of the Rwanda TVET Qualification Framework.Start Learning Now
    CONTACT US

    Phone: (+250)783558414 Email: info@rtb.gov.rw Address: KG17 Ave, Kigali Twitter:: @RTB_Rwanda

    Phone: (+250)783558414

    Copyright:2023- Rwanda TVET Board

    Data retention summary
    Get the mobile app