Skip to main content
  • Frequently Asked Questions(FAQ)
  • You are currently using guest access (Log in)
RTB
  • Home
  • Courses
    • Waste Water Treatment Technology
      • Curriculum Structure and ToG __Waste Water
      • Core modules __Waste Water
      • CCMs_Waste Water Treatment Technology
    • L4 Building Construction
      • BASICS OF AUTOCAD
      • CEMENT BASED BLOCKS AND PAVERS WORKS
      • PERFORM TERRAZZO WORKS
      • QUANTIFYING CONSTRUCTION WORKS
      • BUILDING CONSTRUCTION DRAWING
      • PERFORM COCRETE WORKS
    • CCMs__Electrical Technology
      • CCMs__Electrical Technology
    • General modules __ Fine and Plastic Arts
      • General modules __ Fine and Plastic Arts
    • View all
  • Courses
    Waste Water Treatment Technology
    • Curriculum Structure and ToG __Waste Water
    • Core modules __Waste Water
    • CCMs_Waste Water Treatment Technology
    L4 Building Construction
    • BASICS OF AUTOCAD
    • CEMENT BASED BLOCKS AND PAVERS WORKS
    • PERFORM TERRAZZO WORKS
    • QUANTIFYING CONSTRUCTION WORKS
    • BUILDING CONSTRUCTION DRAWING
    • PERFORM COCRETE WORKS
    CCMs__Electrical Technology
    • CCMs__Electrical Technology
    General modules __ Fine and Plastic Arts
    • General modules __ Fine and Plastic Arts
  • Domestic Electricity

    1. Home
    2. Courses
    3. VIDEO RESOURCES
    4. MORE Video Tutorials
    5. DE
    Sorry, this activity is currently hidden

    Topic outline

    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS

      • Installation Of A Lighting System Controlled From Three Directions File
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS

      • Steps For Construction Of An External Lightning Protection System File
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH

      • Installing An Analog Timer Switch System 1 File
      • Installing An Analog Timer Switch System 2 File
      • Installing An Analog Timer Switch System 3 File
      • Installing An Analog Timer Switch System 4 File
      • Installing A Digital Timer Switch System 1 File
      • Installing A Digital Timer Switch System 2 File
      • Installing A Digital Timer Switch System 3 File
      • Installing A Digital Timer Switch System 4 File
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM

      • Installation of a 3 Gang 2-Way Switch: Steps and Video Demonstration File
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM

      • Installation of a Flame Detector on a PCB File
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM

      • Installation of Power Sockets File
    • CONNECTING FUSES AND CIRCUIT BREAKERS

      • Fuse and Circuit Breaker Connection Steps File
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE

      • Surge Protective Device Installation: Steps File
    • DE
    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM
    • CONNECTING FUSES AND CIRCUIT BREAKERS
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE
    • Home
    • Calendar
    About us
    Rwanda TVET Board (RTB) is a government institution established in 2020 by the presidential order No N° 123/01 of 15/10/2020 published in Official Gazette N° 32 bis of 19/10/2020. It was established under the Ministry of Education, to be at the fore-front of all efforts to promote TVET from level one (1) to level (5) of the Rwanda TVET Qualification Framework.Start Learning Now
    CONTACT US

    Phone: (+250)783558414 Email: info@rtb.gov.rw Address: KG17 Ave, Kigali Twitter:: @RTB_Rwanda

    Phone: (+250)783558414

    Copyright:2023- Rwanda TVET Board

    Data retention summary
    Get the mobile app