Skip to main content
  • Frequently Asked Questions(FAQ)
  • You are currently using guest access (Log in)
RTB
  • Home
  • Courses
    • MANUFACTURING TECHNOLOGY
      • Lathe Machine Operation
      • Bench Work operation
      • Mechanical Fastening
      • Bending Operations
      • Basic Sand Casting
      • ROLLING OPERATIONS
    • MASONRY
      • Curriculum Structure and TOG_MASONRY
      • Core Modules_MASONRY
      • CCMs_MASONRY
    • CCMs__ Tourism
      • CCMs__ Tourism
    • CLASSES + CPD
      • ENGLISH PROFECIENCY
      • AI (Artificial Intelligence)
      • Safety Health and Environment - L3
      • STOP Sexual Harassment
      • TVET TEACHER’S PEDAGOGICAL TRAINING MATERIAL
      • Modern Workspace - Staff Training
    • View all
  • Courses
    MANUFACTURING TECHNOLOGY
    • Lathe Machine Operation
    • Bench Work operation
    • Mechanical Fastening
    • Bending Operations
    • Basic Sand Casting
    • ROLLING OPERATIONS
    MASONRY
    • Curriculum Structure and TOG_MASONRY
    • Core Modules_MASONRY
    • CCMs_MASONRY
    CCMs__ Tourism
    • CCMs__ Tourism
    CLASSES + CPD
    • ENGLISH PROFECIENCY
    • AI (Artificial Intelligence)
    • Safety Health and Environment - L3
    • STOP Sexual Harassment
    • TVET TEACHER’S PEDAGOGICAL TRAINING MATERIAL
    • Modern Workspace - Staff Training
  • Domestic Electricity

    1. Home
    2. Courses
    3. VIDEO RESOURCES
    4. MORE Video Tutorials
    5. DE
    Sorry, this activity is currently hidden

    Topic outline

    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS

      • Installation Of A Lighting System Controlled From Three Directions File
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS

      • Steps For Construction Of An External Lightning Protection System File
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH

      • Installing An Analog Timer Switch System 1 File
      • Installing An Analog Timer Switch System 2 File
      • Installing An Analog Timer Switch System 3 File
      • Installing An Analog Timer Switch System 4 File
      • Installing A Digital Timer Switch System 1 File
      • Installing A Digital Timer Switch System 2 File
      • Installing A Digital Timer Switch System 3 File
      • Installing A Digital Timer Switch System 4 File
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM

      • Installation of a 3 Gang 2-Way Switch: Steps and Video Demonstration File
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM

      • Installation of a Flame Detector on a PCB File
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM

      • Installation of Power Sockets File
    • CONNECTING FUSES AND CIRCUIT BREAKERS

      • Fuse and Circuit Breaker Connection Steps File
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE

      • Surge Protective Device Installation: Steps File
    • DE
    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM
    • CONNECTING FUSES AND CIRCUIT BREAKERS
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE
    • Home
    • Calendar
    About us
    Rwanda TVET Board (RTB) is a government institution established in 2020 by the presidential order No N° 123/01 of 15/10/2020 published in Official Gazette N° 32 bis of 19/10/2020. It was established under the Ministry of Education, to be at the fore-front of all efforts to promote TVET from level one (1) to level (5) of the Rwanda TVET Qualification Framework.Start Learning Now
    CONTACT US

    Phone: (+250)783558414 Email: info@rtb.gov.rw Address: KG17 Ave, Kigali Twitter:: @RTB_Rwanda

    Phone: (+250)783558414

    Copyright:2023- Rwanda TVET Board

    Data retention summary
    Get the mobile app