Skip to main content
  • Frequently Asked Questions(FAQ)
  • You are currently using guest access (Log in)
RTB
  • Home
  • Courses
    • SOLAR PV SYSTEM INSTALLATION
      • Specific_SOLAR PV SYSTEM
      • General_SOLAR PV SYSTEM
      • Curriculum structure_SOLAR PV SYSTEM
      • CCMs_SOLAR PV SYSTEM
    • L4 BUILDING CONSTRUCTION
      • BASICS OF AUTOCAD SOFTWARE
      • TERRAZZO WORKS
      • PERFORM TILE WORKS
      • ADVANCED CONSTRUCTION DRAWING
      • CONCRETE WORKS
      • REINFORCEMENTS STEEL BARS WORKS
    • L5 ANIMAL HEALTH
      • Artificial Ansemination
      • VETERINARY ETHICS AND JURISPRUDENCE
      • CONDUCT FISH FARMING OPERATIONS
      • MAJOR SURGERY
      • BEEKEEPING OPERATIONS
      • COMPANION ANIMAL MANAGEMENT
    • ANIMAL HEALTH
      • DOMESTIC ANIMAL BODY DESCRIPTION
      • RECORDING OF LIVESTOCK HEALTH AND PRODUCTION PARAMETERS
      • WORKPLACE PREPARATION FOR VETERINARY INTERVENTION
      • FODDER CROPS AND PASTURES MANAGEMENT
      • FODDER CROPS CONSERVATION AND DISTRIBUTION
      • CONCENTRATES FEEDS PREPARATION AND DISTRIBUTION
    • View all
  • Courses
    SOLAR PV SYSTEM INSTALLATION
    • Specific_SOLAR PV SYSTEM
    • General_SOLAR PV SYSTEM
    • Curriculum structure_SOLAR PV SYSTEM
    • CCMs_SOLAR PV SYSTEM
    L4 BUILDING CONSTRUCTION
    • BASICS OF AUTOCAD SOFTWARE
    • TERRAZZO WORKS
    • PERFORM TILE WORKS
    • ADVANCED CONSTRUCTION DRAWING
    • CONCRETE WORKS
    • REINFORCEMENTS STEEL BARS WORKS
    L5 ANIMAL HEALTH
    • Artificial Ansemination
    • VETERINARY ETHICS AND JURISPRUDENCE
    • CONDUCT FISH FARMING OPERATIONS
    • MAJOR SURGERY
    • BEEKEEPING OPERATIONS
    • COMPANION ANIMAL MANAGEMENT
    ANIMAL HEALTH
    • DOMESTIC ANIMAL BODY DESCRIPTION
    • RECORDING OF LIVESTOCK HEALTH AND PRODUCTION PARAMETERS
    • WORKPLACE PREPARATION FOR VETERINARY INTERVENTION
    • FODDER CROPS AND PASTURES MANAGEMENT
    • FODDER CROPS CONSERVATION AND DISTRIBUTION
    • CONCENTRATES FEEDS PREPARATION AND DISTRIBUTION
  • CSTRH301: Rain water harvesting

    1. Home
    2. Courses
    3. DIGITAL INTERACTIVE CONTENT
    4. CSTRH301
    Sorry, this activity is currently hidden

    Topic outline

    • Course Overview

      Introduction

      This module describes knowledge and skills required to perform rain water harvesting. It describes the skills, knowledge and attitudes required for the trainee to connect pipes/eave gutter and distribute water.

      Water harvesting sketch

      Learning objectives:

      At the end of this module, the trainee will be able to:

      • Connect pipes/eave gutter
      • Distribute water.



      • Announcements Forum
    • Learning Outcome 1: Connect pipes/eave gutter

      • Indicative Content 1.1: Introduction to rain water harvesting Interactive Content
      • Indicative Content 1.2: Install eave gutters Interactive Content
      • Indicative Content 1.3: Install rain water pipes Interactive Content
    • Learning Outcome 2: Distribute water

      • Indicative Content 2.1: Introduction to the distribute water Interactive Content
      • Indicative Content 2.2: Use gravitation system Interactive Content
      • Indicative content 2.3: Use a manual water pump Interactive Content
    • Sources

      • References Page
    • CSTRH301
    • Course Overview
    • Learning Outcome 1: Connect pipes/eave gutter
    • Learning Outcome 2: Distribute water
    • Sources
    • Home
    • Calendar
    About us
    Rwanda TVET Board (RTB) is a government institution established in 2020 by the presidential order No N° 123/01 of 15/10/2020 published in Official Gazette N° 32 bis of 19/10/2020. It was established under the Ministry of Education, to be at the fore-front of all efforts to promote TVET from level one (1) to level (5) of the Rwanda TVET Qualification Framework.Start Learning Now
    CONTACT US

    Phone: (+250)783558414 Email: info@rtb.gov.rw Address: KG17 Ave, Kigali Twitter:: @RTB_Rwanda

    Phone: (+250)783558414

    Copyright:2023- Rwanda TVET Board

    Data retention summary
    Get the mobile app