Skip to main content
  • Frequently Asked Questions(FAQ)
  • You are currently using guest access (Log in)
RTB
  • Home
  • Courses
    • Trainer Manual
      • Tr_LEVEL2
      • LEVEL3
      • LEVEL4
      • LEVEL5
    • TEACHER'S GUIDE L5
      • TIG WELDING
      • PIPE WELDING USING SMAW
      • BASIC OF PNEUMATIC AND HYDRAULIC SYSTEMS
      • METAL FORMING
      • PERFORM FCAW WELDING
      • DESIGN AND COMMUNICATION GRAPHICS
    • MORE TRAINING MANUALS
      • Trainer Manuals
      • Trainee Manuals
    • VIDEO RESOURCES
      • BUILDING CONSTRUCTION
      • PRODUCTION TECHNOLOGY
      • ROAD CONSTRUCTION
      • AUTOMOBILE
      • PLUMBING
      • PNEUMATICS & HYDRAULICS
    • View all
  • Courses
    Trainer Manual
    • Tr_LEVEL2
    • LEVEL3
    • LEVEL4
    • LEVEL5
    TEACHER'S GUIDE L5
    • TIG WELDING
    • PIPE WELDING USING SMAW
    • BASIC OF PNEUMATIC AND HYDRAULIC SYSTEMS
    • METAL FORMING
    • PERFORM FCAW WELDING
    • DESIGN AND COMMUNICATION GRAPHICS
    MORE TRAINING MANUALS
    • Trainer Manuals
    • Trainee Manuals
    VIDEO RESOURCES
    • BUILDING CONSTRUCTION
    • PRODUCTION TECHNOLOGY
    • ROAD CONSTRUCTION
    • AUTOMOBILE
    • PLUMBING
    • PNEUMATICS & HYDRAULICS
  • Domestic Electricity

    1. Home
    2. Courses
    3. VIDEO RESOURCES
    4. MORE Video Tutorials
    5. DE
    Sorry, this activity is currently hidden

    Topic outline

    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS

      • Installation Of A Lighting System Controlled From Three Directions File
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS

      • Steps For Construction Of An External Lightning Protection System File
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH

      • Installing An Analog Timer Switch System 1 File
      • Installing An Analog Timer Switch System 2 File
      • Installing An Analog Timer Switch System 3 File
      • Installing An Analog Timer Switch System 4 File
      • Installing A Digital Timer Switch System 1 File
      • Installing A Digital Timer Switch System 2 File
      • Installing A Digital Timer Switch System 3 File
      • Installing A Digital Timer Switch System 4 File
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM

      • Installation of a 3 Gang 2-Way Switch: Steps and Video Demonstration File
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM

      • Installation of a Flame Detector on a PCB File
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM

      • Installation of Power Sockets File
    • CONNECTING FUSES AND CIRCUIT BREAKERS

      • Fuse and Circuit Breaker Connection Steps File
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE

      • Surge Protective Device Installation: Steps File
    • DE
    • INSTALLATION OF A LIGHTING SYSTEM CONTROLLED FROM THREE DIRECTIONS
    • CONSTRUCTION OF EXTERNAL LIGHTNING PROTECTION SYSTEMS
    • WIRING, CONNECTING AND SETTING A TIMER SWITCH
    • INSTALLATION OF 3 GANG 2-WAY SWITCH BASED ON WIRING DIAGRAM
    • CONNECTION OF A SMOKE DETECTOR OR FIRE ALARM SYSTEM
    • INSTALLATION OF POWER SOCKET SYSTEMS BASED ON THE WIRING DIAGRAM
    • CONNECTING FUSES AND CIRCUIT BREAKERS
    • INSTALLATION OF A SURGE PROTECTIVE DEVICE
    • Home
    • Calendar
    About us
    Rwanda TVET Board (RTB) is a government institution established in 2020 by the presidential order No N° 123/01 of 15/10/2020 published in Official Gazette N° 32 bis of 19/10/2020. It was established under the Ministry of Education, to be at the fore-front of all efforts to promote TVET from level one (1) to level (5) of the Rwanda TVET Qualification Framework.Start Learning Now
    CONTACT US

    Phone: (+250)783558414 Email: info@rtb.gov.rw Address: KG17 Ave, Kigali Twitter:: @RTB_Rwanda

    Phone: (+250)783558414

    Copyright:2023- Rwanda TVET Board

    Data retention summary
    Get the mobile app